VNA Structural Racking Installation in Bowmanville, ON

THE PROJECT

New VNA Structural Rack Install

All-Stor Group was contracted by Checkpoint Group to execute the installation of a VNA racking system that they designed in supplied.
The project was in Bowmanville, Ontario. The warehouse was renovated and expanded. Our team got it done in under 2 weeks and delivered a clean and ready to go system for their operations.

PROJECT DETAILS

1100+ Pallet Positions – VNA Racking

Offload+ Organize Material
Laser Level Floor
20 FT Structural Racking Uprights
3 Crossbeam levels