THE PROJECT
Install New 3-Deep & 6-Deep Push-Back
Under contract for Checkpoint Group, our team was responsible for the push-back racking installation for a major food distribution warehouse.
The project was for a full warehouse racking install in 2 warehouse bays out in Ingersoll, Ontario.
Majority of this rack install was for various 3-Deep Push-Back racking, but there was one section of back to back 6-deep push-back racking.
PROJECT DETAILS
4300+ Pallet Positions – Push-Back Racking System
Offload Material + Laser Level Floor
17 FT Structural Racking Uprights
3-Deep Push-Back Racking System
6-Deep Push-Back Racking System
Add Additional Bracing For Tunnel Bays