2-Phase racking installation in Windsor, ON

THE PROJECT

Install New Pallet Racking

This 2-Phase warehouse racking install was completed for Rite-Hite a division of Arbon Equipment. We installed 3 rows of roll-formed racking systems, which we helped the client out on-site with the layout as well.

We later came back to install 12 more bays in a different caged off area.

PROJECT DETAILS

396 Pallet Positions.

Phase 1:
Install 60 Racking Uprights (16 FT x 42 Inches)
Install 214 Crossbeams (8 FT)
Install 214 Wiremesh Deck

Phase 2:
Install 15 Racking Uprights (16 FT x 42 Inches)
Install 48 Crossbeams (8 FT)
Install 48 Wiremesh Deck


PROJECT GALLERY

Request a Visit

Ready to Work Together? Maximize Your Space With Us!

Leave a Comment

Your email address will not be published. Required fields are marked *